Tortue LNG, Offshore Senegal
The Greater Tortue Ahmeyim (GTA) is an offshore FLNG export terminal project on the maritime border of Mauritania and Senegal. It involves one of the deepest subsea developments in Africa.
The FLNG facility is designed to provide 2.5 million tonnes per annum, with the total gas resources in the field estimated to be around 15 trillion cubic feet.
Location: Offshore Mauritania and Senegal
CPA products supplied: Cryogenic supports, cold insulation blocks, spring supports, rigid struts, sliding plates and ancillary items
Year: 2023-2019
LNG Canada, Canada
LNG Canada is a LNG export terminal project in Kitimat, British Columbia, Canada.
The project will initially export LNG from two processing units, or “trains,” totaling 14 million tonnes per annum (mtpa) of natural gas, and that, ultimately, the project may add two more trains and increase total production to 26 mtpa.
Location: Kitimat, British Columbia, Canada
CPA products supplied: Cryogenic supports, cold insulation blocks, hanger supports and ancillary items
Year: 2023-2019
Golden Pass LNG, USA
The new Golden Pass liquefaction and export facility, expected to launch in 2024, is being constructed adjacent to the existing LNG import terminal in Sabine Pass.
The giant facility will add three 5.2Mtpa liquefaction trains, a refrigerant and condensate storage tank, a supply dock and a marine delivery facility, a truck unloading facility along with a feed gas pre-treatment facility.
Location: Texas, USA
CPA products supplied: Constant/variable effort spring supports, rigid supports, sliding plates, ancillary items
Year: 2023-2020
Calcasieu Pass LNG, USA
Calcasieu Pass is an LNG export facility project in Cameron Parish, Louisiana, south of the city of Lake Charles. Once complete, the plant will export 10 MTPA of LNG per year.
Location: Louisiana, USA
CPA products supplied: Cryogenic supports
Year: 2020
Scarborough FPU, Australia
The Scarborough FPU is set for completion 2024. With a production capacity of up to 1.8 billion standard cubic feet per day, the topside will be connected to the semi-submersible hull.
It will be installed in a water depth of 3,100ft, approximately 248 miles offshore Western Australia.
Equipped to process natural gas, the FPU can be remotely operated therefore requiring minimal minimal staffing during normal production operations.
Location: Offshore Western Australia
CPA products supplied: Constant and variable effort spring supports
Year: 2023
Dhamra LNG Receiving Terminal, India
With the opening of the terminal India’s regasification capacity will increase to 47 mta. The Dhamra terminal is expected to regasify 2.2M tonnes of LNG in fiscal year 2024 (ending March 2024), backed by IOCL securing a tender for eight LNG cargoes in March 2023 for delivery between June 2023 and May 2024.
Located in Odisha, Indua, Dhamra LNG Receiving Terminal opened in 2023. It has an initial 5 mtpa capacity, with the potential to expand further to 10-12 mtpa. The terminal can cater to LNG carriers with capacities ranging between 70,000 and 265,000 m3 and will offer breakbulk services, allowing the terminal to supply LNG to neighbouring countries, such as Bangladesh and Myanmar.
Location: Odisha, India
CPA products supplied: Cryogenic supports
Year: 2020-2019
Tangguh LNG, Indonesia
Tangguh LNG is an LNG terminal in West Papua, Indonesia. Tangguh LNG extracts natural gas from offshore reservoirs and transfers it to an LNG plant onshore for processing and conversion into LNG. Shipping tankers are used to supply LNG from the plant to markets across Asia Pacific and other regions.
Location: Offshore Western Australia
CPA products supplied: Cryogenic supports and hydraulic snubbers
Year: 2019-2018
Ichthys Offshore LNG Project, Australia
Located 220 km offshore Western Australia, the Ichthys LNG Project is among the most significant oil and gas projects in the world. Gas from the Ichthys Field will undergo preliminary processing offshore and will then be exported to onshore processing facilities via an 890km pipeline. The Ichthys LNG Project is expected to produce up to 8.9 million tonnes of LNG and 1.6 million tonnes of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.
Location: Offshore Western Australia
CPA products supplied: Cryogenic supports
Year: 2014
Hainan LNG Receiving Terminal, China
The Hainan LNG receiving terminal, located at the Yangpu Economic Development Zone, Hainan, China, includes two storage tanks and has a nominal capacity of 3 mmtpa. CPA supplied spring supports and hydraulic snubbers as part of the construction of this terminal.
Location: Hainan, China
CPA products supplied: Spring supports and hydraulic snubbers
Year: 2013
Pluto LNG Project, Australia
The Pluto LNG project, located offshore Western Australia, produces gas from six wells connected via subsea tieback to an offshore facility. The offshore facility exports the gas via a 180km long submarine pipeline to an onshore pipeline then to the LNG processing plant.
Location: Offshore Western Australia
C&P products supplied: Cryogenic supports
Year: 2012