Long Son Petrochemical Complex – Vietnam
Long Son Petrochemicals Complex is an integrated petroleum and chemical complex constructed in Long Son Island of Ba Ria-Vung Tau province, Vietnam. Commissioned in 2023, it is the first integrated petrochemical complex in the country. The Long Son Refinery will have a capacity of 200,000 barrels a day. Annual output also includes 1.4 MMtpy of plastic resins, 500,000 tpy of high-density polyethylene, 500,000 tpy of linear low density polyethylene and 400,000 tpy of polypropylene.
Location: Long Son Island, Ba Ria-Vung Tau province, Vietnam
CPA products supplied: Cryogenic pipe supports and constant/variable effort spring supports
Year supplied: 2022-2020
Petronas RAPID Project – Malaysia
The refinery and petrochemical integrated development (RAPID) project and other associated facilities are part of the Pengerang Integrated Complex (PIC) in Pengerang, Southern Johor, Malaysia.
The RAPID Pengerang project refinery is designed to produce gasoline and diesel that meet Euro 4 and Euro 5 fuel specifications. It also supplies feedstock for the petrochemical complex, which creates highly specialised chemicals. The refinery uses modern technologies to develop these products and follows stringent environmental regulations.
Location: Pengerang, Southern Johor, Malaysia
CPA products supplied: Hot supports, constant/variable effort spring supports, rigid struts, hydraulic snubbers, rigid hangers, sliding plates and ancillary items
Year supplied: 2023-2016
BAPCO Modernization Programme – Bahrain
BMP’s objectives are to increase refining capacity, enhance the product slate, improve the energy efficiency, and emerge as one of the most competitive and environmentally compliant refineries in the region.
The programme will increase refinery crude capacity by 42% from 267000 barrels per day (bpd) to 380,000 bpd. Also, Resid Hydrockracking unit is designed to convert 78% of lower grade feedstock into distillates which will then be refined into high-margin diesel and kerosene.
Location: Kingdom of Bahrain
CPA products supplied: Cryogenic pipe supports
Year supplied: 2023-2019
PTTGC Olefins Modifications Project, Thailand
This Olefins Modifications Project, designed to enhance PTT Global Chemical’s feedstock flexibility and long-term competitiveness, involved the construction of new facilities to change the main composition of existing feedstock from ethane to propane to increase propylene production. Specifically, it involved the construction of a ‘C3 Splitter’ and an additional distillation tower reaching more than 100 meters.
Location: Map Ta Phut, Thailand
CPA products supplied: Cryogenic pipe supports
Year supplied: 2022-2021
Jamnagar Refinery – J3 Project, India
The J3 complex of Reliance Industries Limited (RIL) comprises the world’s largest coke gasification complex and petrochemical plants. The Jamnagar project, known as J3, was undertaken to increase production capacity of ethylene and other petroleum products at the complex. This includes expansion of Jamnagar’s gasification plants, ethylene cracker complex, and paraxylene plant. CPA supplied cryogenic supports as part of this project.
Location: Gujarat, India
CPA products supplied: Cryogenic pipe supports
Year supplied: 2016
Gas To Gasoline (Gtg) Plant, Turkmenistan
Located in the Ahal region of Turkmenistan, this large GTG plant produces 600,000 tons per annum of high-quality motor gasoline from natural gas. As part of the construction of this plant, CPA supplied variable and constant effort spring supports, hydraulic snubbers and pipe shoes.
Location: Ahal, Turkmenistan
CPA products supplied: Variable effort spring supports, constant effort spring supports, hydraulic snubbers and 40,000+ pipe shoes